Logo
Login Sign Up
Current Revision

ASABE ASAE EP294.3 SEP2003 (R2022)

Computing Electrical Demands for Farms
Best Price Guarantee
Instant

$92.00

2-5 Days

$92.00

SAVE 35%

$119.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
American Society of Agricultural and Biological Engineers Logo

ASABE ASAE EP294.3 SEP2003 (R2022)

Computing Electrical Demands for Farms

PUBLISH DATE 2022
ASABE ASAE EP294.3 SEP2003 (R2022)
This Engineering Practice provides formulas for computing the minimum capacity of feeders supplying farm buildings and the minimum capacity of service conductors and service equipment at the in point of delivery to farms.
SDO ASABE: American Society of Agricultural and Biological Engineers
Document Number EP294.3
Publication Date Dec. 1, 2022
Language en - English
Page Count 3
Revision Level
Supercedes
Committee
Loading...

Failed to load document history.

Publish Date Document Id Type View