Logo
Login Sign Up
Current Revision

ASHRAE Guideline 1.2-2019

Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies
Best Price Guarantee
Instant

$92.00

2-5 Days

$92.00

SAVE 35%

$119.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
American Society of Heating, Refrigerating, and Air Conditioning Engineers Logo

ASHRAE Guideline 1.2-2019

Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

PAGES 70
ASHRAE Guideline 1.2-2019
ASHRAE Guideline 1.2 provides requirements for the application of the Commissioning Process (Cx) described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies.
SDO ASHRAE: American Society of Heating, Refrigerating, and Air Conditioning Engineers
Document Number Guideline 1
Publication Date Not Available
Language en - English
Page Count 74
Revision Level
Supercedes
Committee
Loading...

Failed to load document history.

Publish Date Document Id Type View