Logo
Login Sign Up
Current Revision

ASHRAE Guideline 1.5-2025

Application of the Commissioning Process for Smoke Control Systems
Best Price Guarantee
Instant

$92.00

2-5 Days

$92.00

SAVE 35%

$119.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
The Commissioning Process (Cx) – described in ASHRAE Guideline 0 and ASHRAE/IES Standard 202 – is a quality-oriented process for verifying and documenting that the performance of facilities, systems, and assemblies meet defined objectives and criteria.

ASHRAE Guideline 1.5 describes the technical requirements for the application of the Cx that will verify the smoke control system fulfills the Owner’s Project Requirements (OPR). The guideline incorporates committee experience on projects where smoke control systems and components were expected to work from the day the project was turned over to the Owner, while meeting the requirements of Owners, occupants, users, and facility operations maintenance service organizations at a high level of satisfaction.
SDO ASHRAE: American Society of Heating, Refrigerating, and Air Conditioning Engineers
Document Number Guideline 1
Publication Date Jan. 1, 2025
Language en - English
Page Count 36
Revision Level
Supercedes
Committee
Loading...

Failed to load document history.

Publish Date Document Id Type View