High-Performance Sequences of Operation for HVAC Systems (Includes Supporting Files)
ASHRAE Guideline 36 establishes standardized advanced sequences of operation for common HVAC systems that help to reduce engineering, programming, and commissioning time; reduce energy consumption; and improve indoor air quality.
Rather than develop sequences themselves, design engineers can adapt existing standard sequences that have been proven to perform. Energy consumption is reduced by making systems less dependent on proper implementation and commissioning of control sequences, and by ensuring that proven, cost-effective strategies, including those required by ASHRAE standards and building codes, are fully implemented. IAQ is improved by ensuring control sequences are in compliance with IAQ standards and codes such as ASHRAE Standard 62.1. Diagnostic software detects and diagnoses system faults and makes operators aware of them before they cause performance problems, further reducing energy consumption and reducing system down time.
The 2024 edition of ASHRAE Guideline 36 includes 23 addenda to the 2021 edition. Key updates include:
Guideline 36 is intended for HVAC designers, control contractors, commissioning agents, and building owners, operators, and maintenance technicians.
| SDO | ASHRAE: American Society of Heating, Refrigerating, and Air Conditioning Engineers |
| Document Number | Guideline 36 |
| Publication Date | Not Available |
| Language | en - English |
| Page Count | |
| Revision Level | |
| Supercedes | |
| Committee |
Failed to load document history.
| Publish Date | Document Id | Type | View |
|---|