Standard Specification for Multi-Story Building External Evacuation Platform Rescue Systems
This specification covers the specifications, safety requirements, performance, design, practices, marking instructions and test methods for multi-story building external evacuation platform rescue systems (PRS) for emergency escape of persons who cannot use the normal means of egress to a safe area and for vertical transport of emergency responders.
This specification is applicable only to PRSs that are permanently installed, designed for multi-cycle and repetitive use, and where descent is controlled to limit speed before arrival at a floor or landing zone.
Conversely, this specification does not cover:
1.1 This specification covers the specifications, safety requirements, performance, design, practices, marking instructions and test methods for Multi-Story Building External Evacuation Platform Rescue Systems (PRS) for emergency escape of persons who cannot use the normal means of egress to a safe area and for transport of emergency responders vertically.
1.2 This specification is applicable only to PRSs:
1.3 This specification does not cover:
1.4 Operation of a PRS is limited to trained and authorized operators.
1.5 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.
1.5.1 Exception— In 5.2.1 and 5.2.2, inch-pound units are provided in parentheses after the SI units for information only.
1.6 Table of Contents:
|
|
Section |
|
Scope |
1 |
|
Referenced Documents |
2 |
|
Terminology |
3 |
|
Building Interface Requirements and Installation |
4 |
|
Environmental Conditions |
5 |
|
Fire and Smoke Protection |
6 |
|
Material Requirements |
7 |
|
Structural, Mechanical and Stability Calculations |
8 |
|
Mechanical and Physical Properties |
9 |
|
Buffers and Guides |
10 |
|
Suspension Wire Rope and Wire Rope Connections |
11 |
|
Hoisting Machines and Pulleys |
12 |
|
Means to Prevent Falling of the Platform(s) |
13 |
|
Electrical Power Requirements |
14 |
|
Operation, Control and Communication |