Logo
Login Sign Up
Current Revision

BSI BS 3900-C1:1965

Methods of test for paints. Tests associated with paint film formation -- Wet edge time
Best Price Guarantee
Instant

$195.76

2-5 Days

$195.76

SAVE 10%

$352.37


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


or
British Standards Institution Logo

BSI BS 3900-C1:1965

Methods of test for paints. Tests associated with paint film formation -- Wet edge time

PUBLISH DATE 1965
PAGES 2
BSI BS 3900-C1:1965

1.1 This Part describes a procedure for determining whether the edge of a film of paint or allied material remains “ a live? after a specified period of drying, when applied over the appropriate surface.

NOTE The term “wet edge time? is also known in the paint industry as “lapping time?, “live edge time? and “setting time?.

SDO BSI: British Standards Institution
Document Number 3900-C1
Publication Date Dec. 15, 1965
Language en - English
Page Count 2
Revision Level
Supercedes
Committee STI/10
Publish Date Document Id Type View
Dec. 15, 1965 BS 3900-C1:1965 Revision