BSI BS 6349-3:2013

Current Revision
Maritime works -- Code of practice for the design of shipyards and sea locks

Best Price Guarantee Dec 31, 2013 English 134 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI BS 6349-3:2013

Maritime works -- Code of practice for the design of shipyards and sea locks

PUBLISH DATE 2013
PAGES 134
BSI BS 6349-3:2013

This part of BS 6349 gives recommendations and guidance on the design of shipyard waterfront layouts, dry docks, piers, quays, slipways, shipbuilding berths, shiplifts, floating docks, sea locks, hydrolifts, dock and lock gates, mechanical and electrical services distribution and control systems.

It focuses on ***shipyard-specific design considerations***. It does not apply to general maritime works design or to the detailed planning and design of sea locks, as well as their hydraulic design, which are covered by other parts of BS 6349 and PIANC publications.

This part of BS 6349 is applicable to the design of both commercial and naval base facilities.

Loading...

Failed to load document history.

Publish Date Document Id Type View