BSI BS 7334-7:1992

Current Revision
Measuring instruments for building construction -- Methods for determining accuracy in use of instruments when used for setting out

Best Price Guarantee Mar 31, 1992 English 16 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI BS 7334-7:1992

Measuring instruments for building construction -- Methods for determining accuracy in use of instruments when used for setting out

PUBLISH DATE 1992
PAGES 16
BSI BS 7334-7:1992

WITHDRAWN, 12/1/2011

Procedures for setting out with theodolite and steel tape:

Use the theodolite to establish the main reference line or baseline on the ground. Measure distances along this baseline using the steel tape to mark specific points. At each marked point, set up the theodolite to measure angles to other desired points for accurate positioning. Use the combination of angular and linear measurements to precisely locate all required points on the site.

Procedures for setting out with theodolite:

Install the theodolite at a known reference point. Measure horizontal and vertical angles to determine the positions of other points relative to the reference. Record the angular measurements carefully. Use these angles to triangulate and establish exact positions on the ground without relying on tape measurements.

Loading...

Failed to load document history.

Publish Date Document Id Type View