BSI BS EN 50342-1:2015+A2:2021

Current Consolidated
Lead-acid starter batteries -- General requirements and methods of test

Best Price Guarantee Mar 11, 2022 English 30 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI BS EN 50342-1:2015+A2:2021

Lead-acid starter batteries -- General requirements and methods of test

PUBLISH DATE 2022
PAGES 30
BSI BS EN 50342-1:2015+A2:2021

TC21X working group 3 has agreed to implement the following changes to EN 50342-1:2015/1:2018:

- Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document.

- Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached.

To prevent this, the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.

Loading...

Failed to load document history.

Publish Date Document Id Type View