BSI BS EN 62439-3:2012

Current Revision
Industrial communication networks. High availability automation networks -- Parallel redundancy protocol (PRP) and high availability seamless redundancy (HSR)

Best Price Guarantee Oct 31, 2012 English 62 Pages

This Document Has Been Superseded

A newer publication replaces it: BSI BS EN IEC 62439-3


Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI BS EN 62439-3:2012

Industrial communication networks. High availability automation networks -- Parallel redundancy protocol (PRP) and high availability seamless redundancy (HSR)

PUBLISH DATE 2012
PAGES 62
BSI BS EN 62439-3:2012

IEC 62439-3:2012 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: duplication of the LAN, resp. duplication of the transmitted information.

This second edition cancels and replaces the first edition published in 2010. It constitutes a technical revision.

The main changes with respect to the previous edition are:

  • specification of the interconnection of PRP and HSR networks;
  • introduction of a suffix for PRP frames;
  • clarification and modification of specifications to ensure interoperability;
  • slackening of the specifications to allow different implementations;
  • consideration of clock synchronization according to IEC 61588;
  • introduction of test modes to simplify testing and maintenance.

This publication is to be read in conjunction with IEC 62439-1:2010.

Loading...

Failed to load document history.

Publish Date Document Id Type View