BSI DD CLC/TS 61850-80-1:2010

Withdrawn Revision
Communication networks and systems for power utility automation -- Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104

Best Price Guarantee Mar 31, 2010 English 142 Pages

This Document Has Been Superseded

A newer publication replaces it: BSI PD IEC/TS 61850-80-1


Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI DD CLC/TS 61850-80-1:2010

Communication networks and systems for power utility automation -- Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104

PUBLISH DATE 2010
PAGES 142
BSI DD CLC/TS 61850-80-1:2010

This technical specification gives a guideline on how to exchange information from a CDC-based data model (for example IEC 61850) using IEC 60870-5-101 or IEC 60870-5-104 between substation(s) and control center(s). Mostly guidelines for functions needed in a substation gateway device are given.

The goal of this technical specification is to describe standardized mapping of device-oriented data models (for example IEC 61850) with already defined attributes of CDC's and services (for example IEC 61850-7) onto the already defined ASDU's and services of IEC 60870-5-104 or IEC 60870-5-101. It is not the goal of this technical specification to add any extensions to published standards (for example IEC 61850 or IEC 60870-5-104 or IEC 60870-5-101).

After an introduction giving a basic description of the mapping, the mapping of the information model with associated data classes, and the mapping of services are described. Clause 9 shows how the mapped data and services according to the IEC 60870-5-104 and IEC 60870-5-101 protocol are marked (selected) in the interoperability sheet.

The scope of this technical specification is to achieve real-time exchange of process information required for operational purposes between a substation using a CDC-based data model (for example IEC 61850) and (a) control centre(s) using a communication link over a wide area network (WAN) compliant to the definitions of IEC 60870-5-101 or IEC 60870-5-104.

The amount of real-time information provided by the substation-gateway device can vary dependent on the operational needs. Actors could be regional and nationwide control centers that receive real-time information in order to monitor and control geographically widespread processes.

The described mapping can be used for several fields of application of power utilities, such as:

  • substations
  • hydro and wind power plants
  • decentralized energy resources (DER)

The mapping is based on the definitions of the standard series IEC 61850 Edition 1.0 and IEC 60870-5-104:2006/IEC 60870-5-101:2003. The scope of the mapped IEC 60870-5-104 and IEC 60870-5-101 subset is given in Clause 9.

This technical specification focuses mainly on defining rules and functions of a gateway device as a part of the substation. However, the rules and functions are also valid when an IED may optionally be connected directly to a WAN compliant with IEC 60870-5-101 or IEC 60870-5-104 and therefore, the mapping has to be done inside the IED.

Loading...

Failed to load document history.

Publish Date Document Id Type View