BSI PD CLC/TS 61400-26-2:2017

Withdrawn Revision
Wind turbines -- Production-based availability for wind turbines

Best Price Guarantee Oct 26, 2017 English 51 Pages

This Document Has Been Superseded

A newer publication replaces it: BSI BS EN IEC 61400-26-1


Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI PD CLC/TS 61400-26-2:2017

Wind turbines -- Production-based availability for wind turbines

PUBLISH DATE 2017
PAGES 51
BSI PD CLC/TS 61400-26-2:2017

This part of IEC 61400 provides a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators.

The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation.

It is not the intention of this Technical Specification to define how production-based availability shall be calculated. Nor is it the intention to form the basis for power curve performance measurements, which is the objective of IEC 61400-12.

This document also includes informative annexes with:

  • examples of determination of lost production,
  • examples of algorithms for production-based indicators,
  • examples of other performance indicators,
  • examples of application scenarios.
Loading...

Failed to load document history.

Publish Date Document Id Type View