BSI PD IEC/TR 61375-2-7:2014

Current Revision
Electronic railway equipment. Train communication network (TCN) -- Wireless Train Backbone (WLTB)

Best Price Guarantee Apr 30, 2014 English 36 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI PD IEC/TR 61375-2-7:2014

Electronic railway equipment. Train communication network (TCN) -- Wireless Train Backbone (WLTB)

PUBLISH DATE 2014
PAGES 36
BSI PD IEC/TR 61375-2-7:2014

This part of IEC 61375 describes the protocols stack of a radio based Wireless Train Backbone which is used in distributed power freight trains.

This part provides information on the physical layer, the data link layer, the application layer and distributed power application.

The automatic inauguration of the radio based Wireless Train Backbone is not considered in this technical report.

Loading...

Failed to load document history.

Publish Date Document Id Type View