BSI PD IEC TS 63217:2021

Current Revision
Utility-interconnected photovoltaic inverters. Test procedure for over voltage ride-through measurements

Best Price Guarantee Dec 13, 2021 English 26 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI PD IEC TS 63217:2021

Utility-interconnected photovoltaic inverters. Test procedure for over voltage ride-through measurements

PUBLISH DATE 2021
PAGES 26
BSI PD IEC TS 63217:2021

This document provides a test procedure for evaluating the performance of Over Voltage Ride-Through (OVRT) functions in inverters used in utility-interconnected photovoltaic (PV) systems.

This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving OVRT requirements include such installations, e.g. single-phase or 3-phase systems.

Fundamentally, the assessed OVRT performance is valid only for the specific configuration and operational mode of the inverter under test. Separate assessment is required for the inverter in other factory or user-settable configurations, as these may cause the inverter OVRT response to behave differently.

The measurement procedures are designed to be as non-site-specific as possible, so that OVRT characteristics measured at one test site, for example, can also be considered valid at other sites.

This document is for testing of PV inverters, though it contains information that may also be useful for testing of a complete PV power plant consisting of multiple inverters connected at a single point to the utility grid. It further provides a basis for utility-interconnected PV inverters numerical simulation and model validation.