IEC 62381 Ed. 3.0 b:2024

Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
Best Price Guarantee
Instant

$372.68

2-5 Days

$372.68

SAVE 10%

$670.82


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
International Electrotechnical Commission Logo

IEC 62381 Ed. 3.0 b:2024

Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

IEC 62381 Ed. 3.0 b:2024

Automation systems in the process industry involve several critical testing phases to ensure system reliability and performance.

Factory Acceptance Test (FAT) is conducted at the manufacturer's site before system delivery. It verifies that the system meets design specifications and functions correctly.

Site Acceptance Test (SAT) occurs at the installation location after system delivery. This test confirms the system's proper installation and operation in its intended environment.

Site Integration Test (SIT) follows SAT and ensures seamless integration of the automation system with other plant systems, verifying interoperability and communication.

IEC 62381:2024 defines requirements and checklists for the factory acceptance test (FAT), the factory integration test (FIT), the site acceptance test (SAT), and the site integration test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification.

This document provides a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system.

The activities specified in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment. The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system.

This edition includes the following significant technical changes with respect to the previous edition:

  • a) General re-organization of the standard;
  • b) Current technology incorporated;
  • c) Optional factory integration test (FIT) added;
  • d) Replaced the forms in the annexes with detailed checklists of activities which can be used to develop project-specific test plans; and
  • e) Provided additional references to other applicable standards.
SDO IEC: International Electrotechnical Commission
Document Number IEC 62381
Publication Date Not Available
Language b - English & French
Page Count 88
Revision Level 3.0
Supercedes
Committee 65E