IEC 62862-4-1 Ed. 1.0 en:2022

Current Revision
Solar thermal electric plants - Part 4-1: General requirements for the design of solar power tower plants

Best Price Guarantee Sep 1, 2022 English 34 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
International Electrotechnical Commission Logo

Solar thermal electric plants - Part 4-1: General requirements for the design of solar power tower plants

PUBLISH DATE 2022
PAGES 34

Solar thermal electric plants - Part 4-1: General requirements for the design of solar power tower plants

IEC 62862-4-1:2022 specifies the general requirements for the design of solar power tower plants and covers the electric power system requirements, the solar resource assessment, the site selection, the overall planning, the layout of the heliostat field and the receiver tower, the layout of the power block, the collector system, the heat transfer, the thermal energy storage and steam generation system, the steam turbine system, the water treatment system, the information system, instrumentation and control, the electrical equipment and system, occupational safety and occupational health.

This document is applicable to the design requirements of newly built, expanded or rebuilt solar power tower plants employing steam turbines with molten salt or water-steam as heat transfer fluid.

Loading...

Failed to load document history.

Publish Date Document Id Type View