IEC/TS 62600-102 Ed. 1.0 en:2016

Current Revision
Marine energy - Wave, tidal and other water current converters - Part 102: Wave energy converter power performance assessment at a second location using measured assessment data

Best Price Guarantee Aug 1, 2016 English 1 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
International Electrotechnical Commission Logo

Marine energy - Wave, tidal and other water current converters - Part 102: Wave energy converter power performance assessment at a second location using measured assessment data

PUBLISH DATE 2016

Marine energy - Wave, tidal and other water current converters - Part 102: Wave energy converter power performance assessment at a second location using measured assessment data.

IEC TS 62600-102:2016(E) describes the required methods and the required conditions to determine the power performance of the Wave Energy Converter 2 (WEC 2) in Location 2, possibly at a different scale and with configuration changes to accommodate the new site conditions, in all cases based on measured power performance of WEC 1 in Location 1.

This technical specification allows for assessment at Location 1 or Location 2 based on limited/incomplete data material, as long as this is accompanied by a validated numerical model or physical model and assessment of the uncertainty involved.

Another key element is transparency in the assessment.

Loading...

Failed to load document history.

Publish Date Document Id Type View