Grid code compliance assessment methods for grid connection of renewable energy power plants
IEC TS 63102:2026 highlights the recommended technical methods of grid code compliance assessment of renewable energy (RE) power plants connected to the grid, including wind power plants, photovoltaic (PV) power plants, and hybrid power plants. Hybrid power plants refer to wind/PV power plants equipped with energy storage systems or combined power plants based on wind, PV, and energy storage. The electrical behaviour of RE power plants in this document includes the operating area, control performance, fault ride-through capability, power quality, oscillation, and grid adaptability.
Compliance assessment is the process of determining whether the electrical behaviour of RE power plants meets the specific technical requirements in grid codes or technical regulations. The assessment methods include compliance field test, compliance simulation, hardware-in-the-loop (HIL) simulation and compliance monitoring. The input for compliance assessment includes relevant supporting documents, test results, validated simulation models, controller hardware, and continuous monitoring data. This document focuses exclusively on assessment methods from a technical perspective. It does not address certification-related procedures.
This document is applicable to RE power plants connected to the electrical power grid.
This second edition cancels and replaces the first edition published in 2021. This edition includes the following significant technical changes with respect to the previous edition:
Failed to load document history.
| Publish Date | Document Id | Type | View |
|---|