Logo
Login Sign Up
Current Revision

IEEE 3150-2025

IEEE Guide for Testing the Semi-Conductive Water-Blocking Tape in Cross-Linked Polyethylene Insulated Alternating-Current Power Cables
Best Price Guarantee
Instant

$68.00

2-5 Days

$84.00

SAVE 10%

$136.80


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


or
Institute of Electrical and Electronics Engineers Logo

IEEE 3150-2025

IEEE Guide for Testing the Semi-Conductive Water-Blocking Tape in Cross-Linked Polyethylene Insulated Alternating-Current Power Cables

PUBLISH DATE 2025
PAGES 38
IEEE 3150-2025
New IEEE Standard - Active. Equipment testing methods for the performance of semi-conductive water-blocking tape used in alternating current power cables are provided in this guide.
This guide defines and describes test methods and associated setups for semi-conductive water-blocking tape for cross-linked polyethylene (XLPE) insulated alternating-current (ac) power cables from 110 kV to 500 kV.
The purpose of this guide is to provide a basic testing method for cable manufacturers and users to measure and evaluate the properties of semi-conductive water blocking tape, to help prevent the ablation failure of semi-conductive water blocking tape, and help ensure the safe and stable operation of ac cable systems. This guide provides technical support for semi-conductive water blocking tape for XLPE insulated ac power cable of 110 kV to 500 kV and requirements for testing equipment.
SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 3150
Publication Date Aug. 27, 2025
Language en - English
Page Count 38
Revision Level
Supercedes
Committee Insulated Conductors
Publish Date Document Id Type View
Aug. 27, 2025 3150-2025 Revision