Logo
Login Sign Up
Current Revision

IEEE 1829-2025

IEEE Guide for Conducting Corona Tests on Hardware Assemblies for Overhead Transmission Lines and Substations
Best Price Guarantee
Instant

$64.00

2-5 Days

$79.00

SAVE 10%

$128.70


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
Institute of Electrical and Electronics Engineers Logo

IEEE 1829-2025

IEEE Guide for Conducting Corona Tests on Hardware Assemblies for Overhead Transmission Lines and Substations

PUBLISH DATE 2026
PAGES 34
IEEE 1829-2025

Revision Standard - Active.

Uniform procedures for the testing of ac transmission line and station bus hardware assemblies in high-voltage (>100 kV) laboratories are established by this guide.

Two tests are described by the guide:

  • The first test is a corona performance test.
  • The second is a radio interference voltage (RIV) test.

Visible techniques to determine the onset of positive corona are used by the first test.

The second test is a measurement of the RIV voltage according to ANSI C63.2 or CISPR 16-1-1 and CISPR 18-2.

The permissible radio interference (RI) limits or specified corona extinction voltages are not addressed by this guide. They are set either by regulation or by agreement between the end user and hardware manufacturer.

This guide establishes uniform procedures for the testing of transmission line and station bus hardware assemblies in high-voltage (> 100 kV) laboratories.

Two tests are described:

  • The first one is a corona performance test.
  • The second is a radio interference voltage (RIV) test.

The first test uses visible techniques to determine the onset of positive corona.

The second test is a measurement of the RIV voltage according to ANSI C63.2 or CISPR 16-1-1 and CISPR 18-2.6.

This guide does not address the permissible radio interference (RI) limits or specified corona extinction voltages. They are set either by regulation or by agreement between the end user and hardware manufacturer.

A uniform procedure is a prerequisite to help assure such hardware assemblies are either free from visible corona or do not add any appreciable radio interference (RI) to that already being generated by the transmission line or substation conductors.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 1829
Publication Date April 22, 2026
Language en - English
Page Count 34
Revision Level
Supercedes
Committee Overhead Lines Subcommittee
Loading...

Failed to load document history.

Publish Date Document Id Type View