Logo
Login Sign Up
Current Revision

ISO 21725-2:2021

Simplified design of prestressed concrete bridges - Part 2: Box-girder bridges
Best Price Guarantee
Instant

$287.21

2-5 Days

$287.21

SAVE 15%

$488.26


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
International Organization for Standardization Logo

ISO 21725-2:2021

Simplified design of prestressed concrete bridges - Part 2: Box-girder bridges

PUBLISH DATE 2021
ISO 21725-2:2021

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).

Designs and details for new road bridges address structural integrity by considering the following:

  • the use of continuity and redundancy to provide one or more alternate paths;
  • structural members and bearing seat widths that are resistant to damage or instability; and
  • external protection systems to minimize the effects of reasonably conceived severe loads.
SDO ISO: International Organization for Standardization
Document Number ISO 21725
Publication Date Nov. 1, 2021
Language en - English
Page Count
Revision Level
Supercedes
Committee ISO/TC 71/SC 5
Loading...

Failed to load document history.

Publish Date Document Id Type View