SAE AIR5320 Rev A

Current Revision
Summary of Icing Simulation Test Facilities

Best Price Guarantee Sep 25, 2015 English 41 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
SAE International Logo

Summary of Icing Simulation Test Facilities

PUBLISH DATE 2015
PAGES 41

This SAE Aerospace Information Report (AIR) contains information on most of the major icing simulation ground facilities. An effort was made to obtain data from as many facilities as possible over a two year time period. The data in this document represents the state of the facilities in calendar year 1996.

Facilities are constantly changing and upgrading and, therefore, some facility specifications may change during the life of this report.

Of the 27 facilities described in this report, the primary use is split with approximately half for engine testing and half for wind tunnel testing. The facilities are limited to ground facilities and, therefore, icing tankers have not been included.

Loading...

Failed to load document history.

Publish Date Document Id Type View