Logo
Login Sign Up
Current Revision

SAE AS683 Rev E

Installation Procedures and Torques for Fluid Connections
Best Price Guarantee
Instant

$112.00

2-5 Days

$112.00

SAVE 10%

$201.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
SAE International Logo

SAE AS683 Rev E

Installation Procedures and Torques for Fluid Connections

PUBLISH DATE 2019
PAGES 13
SAE AS683 Rev E
These procedures cover the following: Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Section 4 - Boss end connections, positioned type, with back-up ring. Section 5 - Boss end connections, positioned type, without back-up ring. Section 6 - Boss end connections, non-positioned type. Section 7 - Bulkhead connections.
SDO SAE: SAE International
Document Number AS683
Publication Date Oct. 28, 2019
Language en - English
Page Count 13
Revision Level E
Supercedes
Committee
Loading...

Failed to load document history.

Publish Date Document Id Type View