TAPPI UM822 2012 Edition (R2025)

Current Revision
Green peel bond procedure at the corrugator

Best Price Guarantee Jan 1, 2012 English 5 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
 PDF Preview
This procedure is to provide basic instructions for subjective testing of the corrugated bond at both the single facer and doublebacker glue lines. The combined board should be allowed to cool for approximately 10 minutes at the dry end of the corrugator before evaluation.
Loading...

Failed to load document history.

Publish Date Document Id Type View