API RP 2A-WSD (R2025) 22nd edition

Current Revision
Planning, Designing, and Constructing Fixed Offshore Platforms--” Working Stress Design

Best Price Guarantee Nov 1, 2014 324 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
API RP 2A-WSD (R2025) 22nd edition PDF Preview
API RP 2A-WSD (R2025) 22nd edition
API RP 2A-WSD provides engineering guidelines for the safe design and construction of fixed offshore platforms using a working stress design (WSD) method, which involves applying factors of safety to loads and material strengths. It addresses elements like soil investigation, pile-soil interaction, structural member design, and tubular joint analysis to ensure platform integrity and reliability for the hydrocarbon industry.
Loading...

Failed to load document history.

Publish Date Document Id Type View