BSI BS EN 50518-1:2013

Current Revision
Monitoring and alarm receiving centre -- Location and construction requirements

Best Price Guarantee Sep 30, 2014 English 26 Pages

This Document Has Been Superseded

A newer publication replaces it: BSI BS EN 50518


Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
British Standards Institution Logo

BSI BS EN 50518-1:2013

Monitoring and alarm receiving centre -- Location and construction requirements

PUBLISH DATE 2014
PAGES 26
BSI BS EN 50518-1:2013

This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process.

The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Loading...

Failed to load document history.

Publish Date Document Id Type View